Close Menu
Newsoutnow.comNewsoutnow.com
    Quick Access
    • Bigg-Boss
    • Entertainment
    • High Life
    • Infotainment
    • News
      • Business
      • Sports
      • Technology
    • News Wire
    • Photo Gallery
    • Stars-Wiki
    • Trending
    • World
    Facebook X (Twitter) Instagram
    • About
    • Download the App
    • Contact Us
    Facebook X (Twitter) Pinterest
    Newsoutnow.comNewsoutnow.com
    • Entertainment
    • Infotainment
    • News
      • Sports
      • Business
      • Technology
      • World
    • High Life
    • Trending
    Newsoutnow.comNewsoutnow.com
    Home»News Wire»WBS Power Advances 3.2 GW Energy Infrastructure for Hyperscale Data Center Campus
    News Wire

    WBS Power Advances 3.2 GW Energy Infrastructure for Hyperscale Data Center Campus

    PR NewswireBy PR NewswireMarch 25, 20263 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    TOMASZÓW MAZOWIECKI, Poland, March 24, 2026 /PRNewswire/ — A new hyperscale data center campus with a target capacity of 3.2 GW will be developed in Lublewo, in the municipality of Choczewo in northern Poland’s Pomerania region. The project, named Baltic Data Center Campus, is being developed by WBS Power S.A., which has already secured grid connection conditions for the full 3.2 GW capacity.
      “This will be the largest project of its kind in Poland and one of the largest in Europe,” says Maciej Marcjanik, CEO of WBS Power.WBS Power has taken a strategic step into the hyperscale data center sector, positioning itself as an energy infrastructure provider for AI. The company is responsible for designing, integrating and delivering large-scale, stable and low-emission energy infrastructure that will form the foundation for the development of AI, HPC and cloud infrastructure. “This is a natural step in our growth strategy, enabling us to leverage the expertise and market experience we have developed over many years. We are building the infrastructure that will underpin the next phase of the global digital transformation,” says Hubert Bojdo, CFO of WBS Power.Preparations for the project have taken several months and included the development of the investment concept, the selection of an optimal location and the securing of suitable plot for the development. The chosen site allows the project to scale flexibly across different technological configurations while ensuring access to sufficient power sources. The company is now moving into the next phase of the project. The campus will be built in four phases, each with a planned capacity of 800 MW. Each phase will include:dedicated energy infrastructure for AI workloads,integration with renewable energy sources and battery energy storage systems (BESS),solutions meeting the highest ESG, energy efficiency and energy security standards,platforms designed to support cooperation with global hyperscalers and cloud providers.Preparatory work for all four phases is expected to be completed by the end of 2027, with the first data center planned to become operational around 2028–2029.”The rapid development of AI is driving demand for hyperscale data centers supported by advanced infrastructure and reliable access to large volumes of power. The integration of renewable energy and energy storage with digital infrastructure will be a key pillar of competitiveness for next-generation hyperscale projects,” says Maciej Marcjanik.The Baltic Data Center Campus will be located near one of the largest power substations in Poland. The power supplied to the campus will come from conventional sources complemented by renewable energy and, in the longer term, also nuclear power.”The digital revolution requires infrastructure on an entirely new scale. We selected the location for the Baltic Data Center Campus very carefully, ensuring access to large power capacities, a diversified energy mix already in place today, and the long-term prospect of stable supply supported by future nuclear generation,” adds Hubert Bojdo.The Baltic Data Center Campus is not the first project of this type developed by WBS Power. The company is also advancing the Finsterwalde Data Center project in Germany, with capacity of 500 MW, designed in response to growing demand in the German market for hyperscale data centers efficiently integrated with the energy system.WBS Power brings more than 15 years of experience in developing energy infrastructure, including renewable energy and BESS projects, high-voltage grid infrastructure and powered-land developments.The company’s activity in Poland and Germany reflects a broader trend of building a new European AI infrastructure landscape.”We are proud that a Polish company can contribute to Europe’s energy and digital transformation, strengthening its economic competitiveness and technological sovereignty,” concludes Maciej Marcjanik.CONTACT: Pola Królak, p.krolak@wbspower.com Photo: https://www.newsoutnow.com/wp-content/uploads/2026/03/WBS_Power.jpgLogo:  https://www.newsoutnow.com/wp-content/uploads/2026/03/WBS_Power_Logo.jpg  

    View original content:https://www.prnewswire.co.uk/news-releases/wbs-power-advances-3-2-gw-energy-infrastructure-for-hyperscale-data-center-campus-302719794.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleLittlebird Raises $11 Million to Launch the Only AI That Already Knows What You’re Working On
    Next Article Public Launches Crypto Trading in IRAs
    PR Newswire
    PR Newswire

    PR Newswire is a distributor of press releases headquartered in New York City.

    Next Up For You

    News Wire

    MGM Healthcare Sets Up World’s Largest Intestinal Rehab & Transplant Program in Chennai in Three Years

    April 20, 2026
    News Wire

    Agoda Launches brand new ‘What a Save!’ campaign in India

    April 20, 2026
    News Wire

    State Grid Jiangsu Highlights 99.996% Power Reliability and Streamlined Grid Access for International Businesses Utility outlines low-carbon power supply, reduced connection costs, and investor-focused infrastructure in Suzhou

    April 19, 2026
    News Wire

    BREAKTHROUGH PRIZE ANNOUNCES 2026 LAUREATES

    April 19, 2026
    News Wire

    2025 China & Global Development Reports Published in Hainan

    April 18, 2026
    News Wire

    Akemona to Power Upcoming Tokenized Offering for Industrialized Innovation Impact Portfolio I

    April 18, 2026
    More Reads

    GAC Tech Day 2026 Unveils Five Core Technologies to Lead Smart Mobility

    April 17, 2026

    Tredence Named a Market Leader in the Inaugural ISG Provider Lens™ 2026 Databricks Ecosystem Partners Report

    April 17, 2026

    Bybit DCA Bot x Flexible Savings APR Boost: Exclusive for First-Time Users

    April 17, 2026

    NYSE Content Update: Defense Tech Company AEVEX to Make Its Public Debut

    April 17, 2026

    Cuppa Enters Next Phase of Growth with Strategic Backing and Leadership Re-alignment

    April 17, 2026

    HTX DAO Completes Q1 2026 $HTX Burn: Two-Year Supply Shrinks Over 11% as Deflation Accelerates

    April 17, 2026

    Xinhua Silk Road: Chinese baijiu maker Fenjiu to continue as bridge of communication, cooperation among Global South

    April 17, 2026
    Facebook X (Twitter) Pinterest RSS
    • About
    • Download the App
    • Contact Us
    © 2026 newsoutnow.com

    Type above and press Enter to search. Press Esc to cancel.